This is the install guide for our click-lock vinyl plank: 9" × 60", 5 mm with a 1 mm IXPE pad attached, Välinge 2G locking. It's written for landlords and contractors turning units, but the steps are the same in any house. The figures below are standard practice for rigid-core (SPC) click floors. If you're unsure about an unusual space, call or text 860-792-5954 before you start.
Quick reference
| Item | Standard |
|---|---|
| Acclimation | Boxes flat in the room for 48 hours at normal living temperature (about 65-80°F) |
| Subfloor flatness | Within 3/16" over 10 ft, or 1/8" over 6 ft |
| Expansion gap | At least 1/4" at walls and fixed objects. Use 3/8" in large or very sunny rooms |
| Large areas | Add a T-molding break beyond roughly 40-50 ft in any direction |
| Over concrete | 6-mil polyethylene vapor barrier, seams overlapped 6" and taped |
| Underlayment | None over wood. The pad is attached. Don't add a second foam layer |
| End-joint stagger | At least 8" from row to row. No piece shorter than 8" |
| Locking | Angle-angle (2G). Don't hammer the joints |
| Stairs | Glue down. Don't float. See stairs |
| Space | Indoor, temperature-controlled rooms |
Before you start: a two-day plan
For a typical 800-1,000 sq ft unit with an experienced installer and a helper:
- Day 0 (delivery): boxes stacked in the rooms, heat or AC running at normal living temperature.
- Day 1: pull or protect trim, prep the floor, lay the bedrooms and hall.
- Day 2: living room and kitchen, doorways, transitions and trim.
That's a brisk pace. Bad subfloors, lots of closets, or stairs add time.
Tools
Tape measure, chalk line, a 6-8 ft straightedge, a utility knife with plenty of blades, a speed square, 1/4" and 3/8" spacers, a pull bar, a jamb saw, and a miter or circular saw for rips and notches. Knee pads matter more than any of it.
Step 1: Acclimate
Leave the boxes flat in the rooms where they'll be laid for 48 hours, with the heat or AC at normal living temperature (about 65-80°F). Keep that temperature during the install and after. In a New England winter this is the step people skip, and a floor clicked together straight off a cold truck will move once the unit warms up. That's one reason we carry the boxes inside and stack them by room.
Pull planks from several boxes as you go and mix them, so no run of similar planks clusters in one spot. Check each plank for damage before it goes down. Installing a damaged plank counts as accepting it.
Step 2: Prep the subfloor
The floor must be clean, dry, solid and flat. Flat is the important one. Click joints fail when planks flex over dips.
- Scrape and vacuum. A single drywall screw head under a plank becomes a high spot.
- Check with a straightedge in several directions. Flat means within 3/16" over 10 ft. Fill low spots with floor patch, and sand, plane or grind the high spots. The floor doesn't need to be level, only flat. See subfloor prep for old houses.
- Re-screw squeaky subfloor panels now. You won't get another chance.
- Over concrete (basements, slabs, ground floors on grade): lay 6-mil poly first. See basements.
- Carpet, carpet pad and any existing floating floor come out. Flat, glued-down floors can usually stay. See installing over existing floors.
Undercut door casings with a jamb saw, using a plank as the height guide, so the floor slides under instead of being scribed around.
Step 3: Plan the layout
Run the planks along the longest wall, or toward the main window. In a railroad-style apartment, running them the length of the unit makes it feel bigger. Measure across the room and divide by the plank's face width (just under 9") to see how wide the last row will be. If it comes out as a sliver, rip the first row so the first and last rows are about equal.
Leave at least 1/4" at every wall, pipe, door frame and cabinet base, and 3/8" in large rooms or beside big sunny windows. Floors that run beyond roughly 40-50 ft in any direction, or that pass through narrow openings between big rooms, need a T-molding break. See transitions.
Step 4: The first three rows
These rows set the whole room, so take your time here.
- Cut the tongue off the long edge of the first-row planks that face the wall. Start at the left with spacers against the wall.
- Join the short ends of the first row. With the 2G lock, hold the new plank at an angle, insert its end tongue into the previous plank's end groove, and lower it flat.
- Start row two with an offcut at least 8" long, so the end joints stagger at least 8" from row to row. Avoid a repeating stair-step pattern.
- For each plank in row two, lock the short end to its neighbor first, then lift the plank (and the one beside it slightly), angle the long edge into row one at roughly 20-30°, press forward, and lower it. Kneeling on the previous row helps hold it.
- After three rows, check that they're straight with a string line, then slide the block tight against the spacers.
Don't hammer 2G joints. If a joint won't seat, lift it and re-angle. A pull bar is for the last row and tight spots under door casings, used gently.
The 60" planks are long. On long rows, a second person lifting the far end makes angling them in much easier.
Step 5: The rest of the room
Work row by row. Cut planks face-up with a utility knife: score, snap and trim through the pad. Use a saw for rips and notches. Start the next row with offcuts when they're at least 8" long. The last row is usually a rip. Measure at both ends because walls aren't straight, and leave the gap.
Around pipes, drill a hole 1/2" larger than the pipe, cut out a wedge to the plank edge, and glue the wedge back behind the pipe.
Step 6: Doorways, closets and trim
- In normal-sized apartments the floor can usually run through doorways. Use a T-molding where it meets another floor, in large or long connected areas, and at narrow openings between big rooms.
- Nothing pins the floor. Kitchen cabinets, islands and heavy built-ins sit on the subfloor, not on the floating floor. Baseboard and shoe molding nail into the wall, never down into the planks. Door stops go into the baseboard.
- Pull the spacers, then install trim to cover the gap.
Leave a box of spare planks in the unit's storage or the building's basement, labeled with the color. That's your repair kit.
Rooms with special rules
- Bathrooms: gap at the tub, shower and toilet flange, sealed with 100% silicone at the tub and shower. See is LVP waterproof?
- Basements and slabs: vapor barrier first. See basements.
- Sunrooms, unheated porches and camps left cold all winter: rigid-core floors are made for temperature-controlled rooms. Big swings mean more movement. See why LVP gaps or buckles.
- Stairs: glued, not floated. See stairs.
Care after install
Put felt pads under furniture, a chair mat under rolling chairs, and walk-off mats (rubber or vinyl backed, not latex) at the doors. Sweep or vacuum with the beater bar off, then damp-mop with a pH-neutral cleaner. No wax, polish, oil soap or steam mop. Leave a short care note for the tenant.
The lead-paint rule in older rentals
In housing built before 1978, a paid contractor whose work disturbs more than 6 sq ft of painted surface per room falls under the EPA's Renovation, Repair and Painting (RRP) rule, which means a certified firm and lead-safe work practices. Pulling painted baseboard usually crosses that line, because the whole surface of removed trim counts (EPA FAQ). Massachusetts and Rhode Island add their own lead rules for rentals.
A common way around it is to leave the original baseboard in place, run the floor to it with the gap, and cover the gap with new shoe molding nailed to the baseboard. No old paint gets disturbed.
Questions
Are click-lock joints weaker than glue-down for tenants?
The joints are the weak point under heavy rolling loads and over dips in the subfloor. A flat subfloor, chair mats and felt pads prevent most problems. A damaged plank can be replaced by unclicking back to it from the nearest wall, or with a plank-replacement method your installer knows.
Do I need underlayment?
Not over wood subfloors. The 1 mm IXPE pad is attached. Don't add a second foam layer under it, because extra cushion lets the joints flex. Over concrete, add 6-mil poly as a vapor barrier. That isn't a cushion.
Does the warranty need anything from me?
Install it according to this guide and keep a few photos of the prep (the flatness check, the vapor barrier over concrete). See the warranty.
Products in this guide
9" × 60" XL planks, 20 mil wear layer and $1.99/sq ft. Free inside delivery on 1,000+ sq ft across New England, guaranteed within 48 hours counting business days.