Installing
Subfloor Prep for Vinyl Plank in Old Houses: Flat, Not Level
New England's rental housing is old. Triple-deckers from the 1910s, mill-village duplexes, farmhouses with 150 years of settling. Click-lock vinyl is a good floor for these buildings, but the subfloor is where the job is won or lost. Most click-floor failures, like joints that pop, planks that click underfoot, and seams that open, trace back to a floor that wasn't flat.
Flat vs level
- Level means horizontal. A marble doesn't roll.
- Flat means no humps or dips over a short distance, even if the whole floor tilts.
A floating floor can follow a floor that slopes gently from one side of the room to the other. It can't bridge a dip without the joints flexing every time someone steps on it. Old houses are often out of level and that's fine. What you're fixing is flatness.
The standard for click-lock vinyl: flat within 3/16" over 10 ft, or 1/8" over 6 ft. It's the same figure in our install guide.
How to check a floor in 10 minutes
- Get a straight 6-8 ft level or straightedge.
- Lay it in several directions: along the joists, across them, diagonally, and at the doorways.
- Look for daylight under it. Slide a stack of washers or a tapered gauge into the gaps to measure them.
- Mark the dips in one color and the humps in another.
- Step on the floor and listen. Mark the bouncy spots and the squeaks too.
Do this before the crew quotes labor. Prep is the biggest variable in any old-house flooring job.
Fixing low spots
- Shallow dips: trowel in a cement-based floor patch and feather it out wide. Several thin coats beat one thick one.
- Larger areas: self-leveling underlayment over a primer, with the edges dammed. It doesn't need to make the whole room level. It needs to make it flat.
- Over wood subfloors: use a patch made for wood, and secure loose panels first. Patch won't hold on a moving floor.
Let every patch dry fully before the floor goes down.
Fixing high spots
- Wood: plane or belt-sand the high seam or board, and set any proud nail heads.
- Concrete: grind it, with dust control.
- Old adhesive ridges: scrape them flat. Don't sand old black mastic or 9×9 tile that may contain asbestos. Float over it. See installing over existing floors.
Sags toward the middle of the house
Triple-deckers and older multifamilies often sag toward a center bearing wall or a beam that has settled. Over a long run this looks dramatic, but each 10 ft section may be flat enough. Check flatness in sections, not end to end. If the sag is concentrated, a dip over 2-3 ft, you're in patch territory. If a joist is cracked or a beam has dropped, that's a structural repair first, not a flooring problem.
Squeaks and loose boards
Screw the subfloor down into the joists before the new floor goes in. Find the joists by the nail lines. Squeaks under a floating floor don't go away. They just get harder to reach.
Old plank subfloors
Many pre-1940 houses have 1×6 or 1×8 board subfloors, sometimes with hardwood on top. If the boards are cupped, loose, or have gaps wide enough to flex a plank, either:
- re-nail and plane them flat, or
- cover them with 1/4" or thicker underlayment plywood, fastened on a tight grid, with the seams staggered from the boards.
The second is often faster on a really rough floor, and it gives the planks a clean base. Remember it raises the floor height at doors and transitions.
How long prep takes
A straightforward 1990s apartment might need an hour of scraping. A triple-decker unit with dips, squeaks and old tack strip can need a full day before the first plank. Budget for it. See what vinyl plank really costs.
Questions
Can the attached pad hide small bumps?
It smooths out tiny imperfections like grit and minor seams. It doesn't fix dips or humps. Don't count on it.
Do I have to level the whole floor?
No. Fix the flatness. The slope can stay.
What about lead paint on old floors?
Painted wood floors in pre-1978 houses may have lead paint. Sanding them falls under lead-safe work rules for paid contractors (EPA RRP). Cover rather than sand where you can.
Products in this guide
9" × 60" XL planks, 20 mil wear layer and $1.99/sq ft. Free inside delivery on 1,000+ sq ft across New England, guaranteed within 48 hours counting business days.